Tapal Tea (Pvt.) Ltd.

Project Information

 
Name
Tapal Tea (Pvt.) Ltd.
Project Size
528 KW
Client Type
Industrial
Output Before Maintenance
60,588 kWh/Month

 

Output After Maintenance
72,706 kWh/Month
 
Additional Annual Savings
Rs 5,089,392
 

Name: Pakistan State Oil

Project Size: 500 KW

Client Type: Industrial

Output Before Maintenance: 57,375 kWh/Month

Output After Maintenance: 68,850 kWh/Month

Additional Annual Savings: Rs 4,819,500

Solcare completed a results-driven solar maintenance project for Tapal Tea (Pvt.) Ltd., an industrial facility operating a 528 kW solar power system. The assignment focused on restoring system efficiency through professionally executed cleaning, carried out by trained technicians using specialized equipment and water-saving practices suited to industrial environments. The process was designed to safely eliminate dust buildup while protecting the panel surface to support long-term operational life


This targeted maintenance led to a substantial improvement in energy performance, with monthly output rising from 60,588 kWh to 72,706 kWh. The efficiency gains generated additional annual savings of Rs 5,089,392, reinforcing Solcare’s capability to enhance solar asset performance and deliver tangible value for Pakistan’s industrial sector.

Your Shopping cart

Close